East Arc Group
Electrical Installation

Electrical Installation in Adelaide

East Arc Group carries out electrical installation on renovations, extensions and new builds across Adelaide. George Pappas and Arie Minenko are both on site for the work.

East Arc Group Pty Ltd · ABN 20 694 108 328
Licensed Electrical Contractor · Lic. No. BLD 356143

Talk to us about your job

Tell us what stage the job is at and what you are trying to achieve. We will arrange a time to come and look.

Location, timeline, and what you have in mind.
Call George0418 650 058

The short version.

  • A walk through the plan with you, in the actual rooms, before a single cable is run.
  • Full first fix: cable runs, point positions and the switchboard.
  • Coordination with your builder's programme so we are there at the right stage.
  • Second fix: fitting off, terminations and commissioning.
  • Every circuit labelled at the board, in words a person can read.
  • Testing to AS/NZS 3000, and a Certificate of Electrical Compliance issued to you.

This is a two person business by choice. You will not meet George at the quote and then find people you have never met doing the work.

Almost every regret in a finished house was decided at first fix.

An installation happens in two visits, separated by the builder's work. First fix is the rough-in, before the walls are closed. Every cable is run, every point is positioned, the board is set, and the whole layout of the house's electrical system is fixed in place. Second fix is after plaster and paint, when the fittings go on and everything is terminated, tested and energised.

A switch on the wrong side of a door. No power where the bench ended up. A pendant point 300mm off centre over an island that had not been set out yet. None of those are difficult problems at rough-in and all of them are expensive afterwards.

So we spend the time at first fix that most of the trade does not. We walk the plan with you before a single cable is run, standing in the actual rooms, working out where you will put things and how you will move through the space.

Our workFirst fix, Newton Residence. Filmed mid job, before the walls were closed

What it looks like before it disappears.

Our workOn-site wiring, Newton Residence

The detail.

Why the cable runs matter even though nobody sees them

Once the plaster is on, every installation looks the same. The difference between careful work and quick work is buried in the wall, and you find out which one you got years later, when somebody opens the board to add a circuit and either finds a labelled, logical layout or a mess. We work on the assumption that somebody will open it later. Usually that somebody is us.

Cables get run straight, grouped and secured properly. Not because anyone will admire it, but because a tidy rough-in is faster to fault-find, safer to work near, and much easier to add to.

Labelling the board

Every circuit described in words a person can read, not a number that means something only to the electrician who installed it.

What a Certificate of Compliance actually is

A legal document stating the work was carried out and tested to the standard, signed by the licensed contractor who did it. It is your evidence for insurance, for a future sale, and for anybody who works on the house later. It is not optional and it is not an extra. Every job we do produces one and it is issued to you without you having to ask.

Working on an older home

Most of our renovation work is exactly this. Older homes need the existing circuits assessed before new work is added, because what is already in the wall determines what can safely be extended and what has to be replaced. That assessment happens at the site visit, not on the day.

How it runs.

01

A site visit and a look at the plans

On a renovation the existing wiring usually decides more than the new work does.

02

A written quote

Itemised by area or by stage.

03

First fix

Timed to your builder's programme.

04

Second fix

Once the walls are finished.

05

Testing, certification and handover

Tested to AS/NZS 3000, the board labelled, and a Certificate of Electrical Compliance issued to you.

Licensed, and on site ourselves.

Both of us are on site. This is a two person business by choice. You are not going to meet George at the quote and then find two people you have never met doing the work.

East Arc Group Pty Ltd is a licensed electrical contractor in South Australia, licence number BLD 356143, ABN 20 694 108 328. George Pappas and Arie Minenko are the two directors and both of them are on site for the work. There is no crew sent in our place and no subcontractor you have not met.

Talk to us about your job

Common questions.

Do you work with my builder or do I engage you directly?

Either. On a new build we are usually engaged as a subcontractor and work to the builder's programme. On a renovation clients often engage us directly. Both work, and the difference is mostly about who coordinates the timing.

How far ahead do you need to be booked?

For a rough-in tied to a builder's programme, as much notice as you can give, because the window is fixed by the plasterer. For smaller renovation work, less. Talk to us early even if the dates are soft.

Can you work on an older home with existing wiring?

Yes, and most of our renovation work is exactly that. Older homes usually need the existing circuits assessed before new work is added, because what is already in the wall determines what can safely be extended and what needs replacing.

Do you do the lighting design as well, or just install it?

Both, and they are separate services. If you already have a lighting plan we will install to it. If you do not, we design it. See the Lighting Design page.

Will I get a certificate?

Yes, a Certificate of Electrical Compliance is issued on every job. You do not have to ask for it.

Do you install what I have bought myself?

Usually yes, provided the fittings carry an RCM mark and are suitable for where they are going. Send us the details before you buy anything for a wet area or an outdoor location, because that is where most client-supplied fittings turn out to be unsuitable.

Talk to us before the cables go in.

The most useful conversation on any installation happens before rough-in, standing in the rooms with the plan. Tell us what stage the job is at and we will arrange a time. If you already have a lighting plan we will build to it, and if you do not, see lighting design.

Talk to us about your jobCall 0418 650 058